Supply, installation, integration, commissioning and maintenance for 2 years of ITS traffic surveillance, control and regulation of traffic on the highway and in tunnels. The Windsor-Essex project is an 11 km-long corridor, of which 1.8 km are in 13 tunnels, including the respective green areas.
The scope of the work includes:
As a brief summary the most important managed equipment includes:
To all of this is added the implementation of communications infrastructure and the integration of any necessary software applications for the correct operation of ATMS equipment from the control centre.