Skip to main content

Integral operation and maintenance service for Barcelona Airport's water networks

Redes hidráulicas del aeropuerto de Barcelona

Integral operation and maintenance service for Barcelona Airport's water networks, ensuring that the installations are kept operational at all times and carrying out preventive, corrective, modification, predictive and statutory maintenance of the installations to ensure that the installation to be maintained functions correctly and continuously; prevent or correct and damage that may be caused to the airport's water and sewerage networks. 

The following installations are maintained:

  • 12 water collection wells
  • 3 purification plants and 3 bilge pumping stations: Remolar, Illa and Roberta
  • 12 water supply pumping stations
  • 75 km of drinking ware network pipes, flush valves and irrigation
  • 12 water accumulation tanks
  • 20 km of waste water network pipes
  • 68 waste water pumping stations
  • 111 infiltration and flushing pumping tanks
  • 1 packaged pump station and 5 pressure breaking manholes
  • 7 km of Satujo inflatable solutions and 15 km of outlets and drains
  • 58 km of channels and flying field drainage network
  • 10 hydrocarbon separation plants
  • 10 sludge settlers
  • 1 portable purification plant and 1 bilge water purification plant
  • 15 km of electrical galleries
  • 206 electrical panels
  • 1 septic tank

 

aeropuerto_BCN