Second phase of the ARTEMISA project, the main objectives of which are to update and standardise both the low voltage electrical equipment and the instrumentation and control equipment; roll out an internal communications network at the plant to connect automatic control elements together, and integrate the treatment process's measurement and operation elements to improve the efficiency of processes and facilitate supervision and remote control from the basin process centre
The work was done at the following WWTPs:
The following equipment has been installed: