Skip to main content

Shadow toll system and traffic control (ITS) for the A-21 motorway (sections 4 and 5) and tunnel safety and control installations

Shadow toll system

Implementation of a shadow toll system, equipment and traffic control systems (ITS) for sections 4 and 5 of the A-21 motorway and safety and control installations for the Yesa (1,632 m) and Liédena (945 m) inter-urban tunnels. These three systems are operated from two control centres.

The shadow toll system includes roadside counting and verification equipment to allow traffic to be controlled and monitored in real time; video surveillance cameras, variable message panels and weather stations have been installed, which, among other components, make up the open-air equipment installed for the ITS system.

 

The contract covers tunnel safety and control installations, including but not limited to:

  • Lit-up signage system
  • Traffic capacity control system
  • Access/gauge control system
  • Environmental measurement system
  • Fire detection system
  • CCTV system
  • Automatic incident detection (AID) system
  • Ventilation control system
  • Public address System
  • Radio communication system
  • Control system
  • Communications network

tunel1    peaje sombra